Displaying 1-8 of 11 results.

50 Villas at Lusail

Location: Lusail, Doha - Qatar
Completion Date: 2016/01/01

The roofing and substation of the 50 Villas at Lusail have the conventional membrane system, whereas the wet areas and the water tanks are to be done by cementicious. ...

24 Villas at Al Rayyan

Location: Al Rayyan, Doha - Qatar
Completion Date: 2015/04/05

The roofing and wet areas in the 24 Villas at Al Rayyan were the conventional membrane system. ...

20 Villas at Al Wakra

Location: Al Wakra, Doha - Qatar
Completion Date: On Going

The roofing system of the 20 Villas is the conventional membrane system, whereas the superior cementicious was applied in the wet areas. ...

3B – Commercial Building at Al Najma

Location: Al Najma, Doha - Qatar
Completion Date: On Going

Crystalline material was used to cast in the 3 basements project at Al Najma. After the completion of the raft, slurry and water stopper were applied prior to the casting of the walls. ...

Commercial Building at Al Wakra

Location: Al Wakra, Doha - Qatar
Completion Date: 2015/09/15

The substructure of the commercial building in Al Wakra was casted by crystalline... ...

D – Ring Road Office Building

Location: D- Ring Road, Doha - Qatar
Completion Date: 2015/03/21

The substructure of the office building on the D - Ring Road was done by the conventional membrane and protection board system. ...

Old Airport Commercial Street - Office Building

Location: Old Airport, Doha - Qatar
Completion Date: 2015/06/28

The substructure of the office building was done by the conventional membrane and protection board system. ...

Private Palace at Al Khor

Location: Al Khor, Doha - Qatar
Completion Date: 2015/02/07

The roofing and the wet areas were done the traditional membrane system. ...

Displaying 1-8 of 11 results.